Bill of Materials (BOM) Software
for manufacturing ERP
Build every product from one exact recipe: components, quantities, scrap allowance, operations and cost in a single BOM. Explode it for any batch size, and turn it into a work order with material lines already filled in.
What a manufacturing BOM has to answer
A bill of materials answers three questions before anyone touches a machine: what goes into this product, how much of it, and how much is lost on the way. If any answer is wrong, the error shows up later as a stock-out in the middle of a batch, a purchase order raised too late, or a product sold below its real cost.
Fininvo ERP keeps the BOM next to the rest of the business. Components are the same inventory products your stores team receives on goods receipt notes, with their own stock levels, cost price and HSN code for GST. The finished product is an inventory product too, so a completed work order adds stock that sales can invoice the same day.
The sections below walk through a real example, a wooden dining chair, from the component list to the exploded material requirement for a batch of 50.
Worked example
BOM for one wooden dining chair
BOM output quantity is 1 chair. The last two columns are what BOM explosion returns: the line quantity raised by its scrap percentage, first for one chair and then for a production run of 50.
| Component | Qty per chair | Unit | Scrap % | Exploded, 1 chair | Exploded, 50 chairs |
|---|---|---|---|---|---|
| Seat panel, plywood 18 mm | 1 | nos | 5 | 1.05 | 52.5 |
| Back rest slat | 3 | nos | 5 | 3.15 | 157.5 |
| Leg, hardwood 450 mm | 4 | nos | 2 | 4.08 | 204 |
| Side rail | 2 | nos | 2 | 2.04 | 102 |
| Wood screw 40 mm | 16 | nos | 10 | 17.6 | 880 |
| Wood glue | 0.05 | kg | 0 | 0.05 | 2.5 |
| Lacquer | 0.12 | litre | 8 | 0.1296 | 6.48 |
| Seat foam cushion | 1 | nos | 0 | 1 | 50 |
How the numbers are calculated
Exploded quantity = line quantity x production quantity x (1 + scrap % / 100). For the legs: 4 x 50 x 1.02 = 204. Screws carry a higher scrap rate (10%) because a few strip or get lost on every bench, so 800 screws become 880. Lines with 0% scrap, like the foam cushion, explode to exactly one per chair. Buyers read this list to see what to order; stores read it to see what to pull for the batch.
Operations on the same BOM
The chair passes four work centers. Setup is charged once per batch; run time is charged for every chair. The BOM form adds them up for the quantity you plan to build.
| Op | Operation | Work center | Setup (min) | Run (min per chair) |
|---|---|---|---|---|
| 10 | Cut and shape parts | Saw station | 30 | 6 |
| 20 | Assemble frame | Assembly bench | 15 | 12 |
| 30 | Sand and lacquer | Finishing booth | 10 | 15 |
| 40 | Fit cushion | Upholstery | 10 | 8 |
| Total | 65 | 41 | ||
Time for a batch of 50
Total time = setup + run x quantity = 65 + 41 x 50 = 2,115 minutes, a little over 35 hours of work center time. Split by operation, finishing is the bottleneck at 760 minutes, which tells the supervisor where a second shift or a second booth pays off.
How cost is rolled up
Material cost is each exploded quantity times the component cost price on its product record. Operation cost is the operation time in hours times the labour rate plus the machine rate you set on that operation. Total BOM cost divided by the BOM output quantity gives cost per unit, in your company currency.
BOM management in Fininvo ERP
Everything a production recipe needs
Components, scrap, operations, cost, versions and the link to work orders and MRP
Component lines
Each BOM line names an inventory product, the quantity used per batch, its unit, a scrap percentage and a critical flag for parts that must never run short.
Operations on the BOM
Add numbered operations with a work center, setup minutes, run minutes per unit, and labour and machine rates per hour. Time and cost are part of the same record as the materials.
Live BOM costing
Material cost uses each component cost price including scrap; operation cost uses setup and run time at the combined hourly rate. The form shows total cost and cost per unit as you type.
BOM explosion
Explode a BOM for any production quantity to get the flat list of raw materials needed, with scrap already added. Use it before you release a work order or call a supplier.
BOM types and versions
Tag a BOM as manufacturing, engineering or template, and give it a version number. A changed recipe becomes a new revision instead of silently overwriting the old one.
Work orders from the BOM
A work order picks a product and its BOM, then copies every component into material lines sized to the planned quantity, so the store knows exactly what to issue for the run.
Engineering change notices
Planned changes to a BOM or routing go through an ECN with a reason, approval stages and an implementation step, so the shop floor knows which recipe is current.
Linked to MRP
When an MRP run finds a shortfall on a manufactured item, approving the suggestion creates a planned work order from that item's active BOM.
Multi-level BOMs, built level by level
A chair frame, a cabinet carcass or a wiring harness is often built in advance and kept in stock. In Fininvo you set that sub-assembly up as its own manufactured product with its own BOM. It is produced on its own work order, brought into stock with a stock adjustment, and then used as a single component line on the parent BOM.
Working this way keeps each level honest: the frame has its own scrap rate and cost, half-built frames are visible as stock, and a shortage at one level does not hide inside the parent.
BOM types and variants
Every BOM carries a type so design drafts never end up on the shop floor by mistake.
Manufacturing (production) BOM
The recipe the shop floor builds to. Work orders and MRP use the active production BOM of a product.
Engineering BOM
A design-stage list kept by the product team. It can differ from what production builds while a design is being proven.
Template BOM
A starting point for a family of similar products. Each variant SKU still gets its own BOM so stock and cost stay exact.
For variants such as a chair in teak and in sheesham, create one BOM per variant SKU. Fininvo does not generate variant BOMs from a product configurator; a BOM per SKU keeps stock, cost and scrap exact for each finish.
One record for materials, scrap and routing time
Many small manufacturers keep the recipe in a spreadsheet and the costing in another. In Fininvo the BOM holds both: the component list with scrap allowances, and the operations that turn those components into a finished good.
From BOM to the shop floor
A work order is created against a product and one of its BOMs. Material lines are generated from the BOM, the order moves through Draft, Planned, Released and In Progress to Completed. Output and scrap are recorded on the shop floor; stock is corrected with an approved stock adjustment.
Controlled change, not silent edits
Recipes change: a supplier substitutes a part, a new scrap rate is measured, an operation is split in two. Give the new recipe a new version, and route planned changes through an engineering change notice so production and costing move together.
Setting up your first BOM
- 1Create the finished product and each raw material as inventory products, with unit and cost price.
- 2Open Manufacturing, then Bill of Materials, and start a new BOM for the finished product.
- 3Add component lines with quantity, unit and scrap %. Mark parts that stop the line as critical.
- 4Add operations with work center, setup minutes, run minutes per unit and hourly rates.
- 5Check the live material, operation and per-unit cost, then save with a version number.
- 6Use Explode with your batch quantity, then create a work order against the BOM.
Notes for Indian manufacturers
- HSN and GST on inputs. Components are inventory products, so the HSN code and GST rate you set on each raw material are the ones used on its purchase bills. The BOM never needs a separate tax setup.
- Realistic scrap rates. Wood, sheet metal and fabric cut losses are often several percent. Put the measured rate on each line instead of padding the quantity, so the extra need is visible and can be reduced later.
- Job work. If a process such as powder coating is sent to a job worker, Fininvo has a separate subcontracting area for material transfers and receipts, so outsourced steps are tracked outside the in-house routing.
- Units that match the stores. Use the unit your stores team counts in (nos, kg, litre, metre). The BOM line and the stock ledger then agree without conversions.
Next step after the BOM: plan shortfalls with material requirements planning (MRP).
Works Great With
Related Features
MRP (Material Requirements Planning)
Net sales-order demand against stock and open orders
Learn moreManufacturing
Work orders, routings, quality and shop floor
Learn moreInventory Management
Raw material and finished goods stock by warehouse
Learn morePurchasing
Purchase orders, goods receipt and supplier bills
Learn moreFAQ
Frequently Asked Questions
A manufacturing BOM is the recipe for one product: every raw material and part it uses, how much of each, the unit, and the scrap allowance. In Fininvo ERP the BOM can also carry the operations needed to build the product, with work center, setup time, run time and hourly rates, so one record drives both material planning and cost.
Put your production recipe in one place
Set up a BOM with components, scrap and operations, explode it for your next batch and create the work order from it.