From a department's request to a matched supplier bill: requisitions with approval, purchase orders emailed to vendors, goods receipt with quality checks, and a 3-way match that shows which bill line is wrong.

14 days freeFull accessCancel anytime

Where buying usually leaks money

In many growing companies a purchase starts as a phone call, the PO is typed after the goods arrive, and the bill is paid because it looks about right. The leaks are predictable: items bought twice because nobody saw the first order, bills paid for goods that failed inspection, prices a little higher than agreed on every repeat order.

Fininvo ERP links each step to the one before it. The requisition records who needed what and against which budget. The purchase order carries the agreed price. The goods receipt note records what actually arrived and passed quality. The supplier bill is then matched against both, line by line.

The worked example below follows one order for an engineering workshop, from GRN to the 3-way match on the supplier's bill.

Worked example

3-way match on one supplier bill

A three-line PO was approved and emailed. The goods came in on one GRN, where two bearings failed the quality check. The supplier then billed the full PO. Prices are in the company currency.

Purchase order, goods receipt and supplier bill compared line by line
ItemPO qty @ priceGRN acceptedBill qty @ priceVarianceMatch result
MS sheet 2 mm100 @ 250.00100100 @ 252.00Price +0.8%Matched
Bearing 620540 @ 1,200.0038 (2 failed QC)40 @ 1,200.00Qty +2 (5%)Quantity variance
Hex bolt M10500 @ 18.00500500 @ 19.00Price +5.6%Price variance

How each line is judged

Sheet price is 2.00 above the PO on 250.00, a 0.8% difference, inside the 1% tolerance, so the line matches. Bearings were billed 40 but only 38 were accepted: 2 over on a PO of 40 is 5%. Bolts were billed at 19.00 against 18.00 agreed, 5.6% over. Two lines are flagged and the bill shows a variance status.

What the team does next

Accounts asks the supplier for a credit note on 2 bearings (2,400.00) and challenges the bolt price, which works out to 500.00 extra on the bill. If the buyer had agreed the new bolt price by phone, the variance is approved with a note instead, so the reason stays on the bill for audit.

Purchase order management in Fininvo ERP

Every step from request to bill

Requisitions, RFQs, purchase orders, goods receipt, 3-way match and vendors

Purchase requisitions

Departments raise standard, urgent, planned or project requisitions with cost centre, budget, suggested vendor, delivery warehouse, justification and attachments.

Item-level requisition approval

Purchase managers approve or reject a requisition, and can approve a smaller quantity on any line. Only approvers with a purchasing role can decide.

Convert to RFQ or PO

An approved requisition becomes a purchase order in one action, or a request for quotation for the vendors you want prices from.

PO approval and sending

Submit a PO for approval, approve it or send it back to draft with a reason, then email it to the vendor with the PO PDF attached, or send it on WhatsApp.

Goods receipt with QC

Receive a PO in parts. Each GRN is checked against the balance still due, over-receipt is blocked, and quality checks can pass or fail the goods before they are accepted.

Stock valued on acceptance

Accepting a GRN adds stock at moving average cost and updates the received quantity on the PO. With automatic posting on, inventory is debited against goods received not invoiced.

3-way match on the bill

A supplier bill raised against a PO is matched line by line: billed quantity against the GRN and billed price against the PO. Lines more than 1% out are flagged.

Vendor master and scorecard

GSTIN with details fetch, PAN, TDS section and rate, MSME status, contacts, addresses with state GSTIN, bank accounts, credit limit and payment terms, plus a weighted vendor scorecard.

The life of a purchase order

Every PO shows its status in the list, so buyers and stores see the same picture. A rejected PO goes back to draft with the approver's reason.

Step 1

Draft

Being prepared by the buyer.

Step 2

Pending approval

Submitted; waiting for an approver.

Step 3

Approved

Cleared to send. With budget control on, the amount is committed against the budget.

Step 4

Sent and acknowledged

Emailed to the vendor; the vendor has confirmed.

Step 5

Partly received / Received

Set by accepted GRNs as goods arrive.

Step 6

Closed or Cancelled

Finished, or stopped before completion.

Requisition first, PO second
Total
12,847
+8.2%
Active
9,432
+12.1%
Pending
1,205
-3.4%
Completed
2,210
+15.6%
Monthly Trend
J
F
M
A
M
J
J
A
S
O
N
D
Breakdown
Requisition types: standard,72%
HSN, estimated price,58%
Approve a reduced45%
Convert to a30%

Requisition first, PO second

The person who needs the goods is rarely the person who buys them. A requisition captures the need with the budget and cost centre it belongs to, a purchase manager approves it, and the buyer turns it into a PO or an RFQ without retyping a line.

Requisition types: standard, urgent, planned, project
HSN, estimated price, required date and budget line on each item
Approve a reduced quantity per line
Convert to a PO or to a request for quotation
Receive what was ordered, and only that
Processed
4,518
+6.7%
Approved
3,892
+9.3%
In Review
412
-1.8%
Efficiency
94.2%
+2.1%
Recent ActivityLive
TXN-1024Active
Purchase order approved
78,900
TXN-1023Sent
Invoice generated
1,45,000
TXN-1022Completed
Payment received
62,300
TXN-1021Processed
Credit note issued
12,800

Receive what was ordered, and only that

Goods receipt is where purchasing meets stores. Fininvo checks every GRN against what is still due on the PO, records quality results, and only adds stock when the receipt is accepted.

Partial receipts against one PO
Over-receipt beyond the PO balance blocked
Pending QC, QC passed or failed, accepted or rejected
Stock at moving average cost on acceptance
Pay for what was received, at the agreed price
Records
8,204
+11.4%
Automated
6,150
+18.2%
Manual
2,054
-5.6%
Accuracy
99.7%
+0.3%
Monthly Trend
J
F
M
A
M
J
J
A
S
O
N
D
Breakdown
Runs when a72%
Quantity against the58%
Lines more than45%
Each variance approved30%

Pay for what was received, at the agreed price

Three-way matching compares the supplier bill with the GRN and the PO before you pay. Each line shows the PO quantity and price, the received quantity and the variance, so the accounts team sees exactly which line to query.

Runs when a bill is created against a PO, or on demand
Quantity against the GRN, price against the PO
Lines more than 1% out flagged as quantity, price or both
Each variance approved with a note, or queried with the vendor

Vendor management

A vendor record holds everything purchasing and accounts need: legal and trade name, GSTIN with a fetch of registered details, PAN and TAN, TDS section and rate, MSME status, credit limit, payment terms and incoterms. Contacts, addresses with their own state GSTIN and bank accounts sit on the same record, and each vendor has a ledger and balance.

The vendor scorecard records quality, delivery, price, service and compliance scores from your reviews, works out a weighted overall score and gives a grade from A to D, so the next RFQ goes to vendors who have earned it.

Notes for Indian buyers

  • GSTIN per state. A vendor with branches in two states has two GSTINs. Store each address with its GSTIN so bills carry the right one for input tax credit.
  • TDS on contractors. Set the TDS section on the vendor, and record the 194C(6) declaration for transporters who have given one.
  • MSME payment terms. Flag MSME vendors on the master so their payment terms are visible to whoever approves the payment run.
  • HSN on the requisition. Putting the HSN code on the requisition line carries it through to the PO and bill.

Shortages on the shelf often start in receiving. See physical stock verification.

FAQ

Frequently Asked Questions

Purchase order management software runs buying from the first request to the supplier bill: requisitions, approvals, purchase orders sent to vendors, goods receipt, and matching the bill against what was ordered and received. In Fininvo ERP these steps are linked documents, so a requisition becomes a PO, the PO is received on GRNs, and the bill is matched against both.

Buy with a paper trail

Raise a requisition, approve it, send the PO and match the supplier bill against what you received.