Recipes that include the loss
Cleaning, roasting, grinding and sieving all lose weight. A recipe that ignores process loss understates both the material you need and the cost of every pack.
ERP for food processors
Food processing is manufacturing with two extra problems: the raw material changes from lot to lot, and the finished product has a date after which it cannot be sold. Fininvo ERP holds the recipe, checks what comes in, plans production from orders, records batches with their dates and prepares the GST paperwork for what goes out.
What the industry needs
A food plant buys agricultural raw material, loses some of it in cleaning and processing, and sells a packed product with a shelf life. The ERP has to follow all three.
Cleaning, roasting, grinding and sieving all lose weight. A recipe that ignores process loss understates both the material you need and the cost of every pack.
Moisture, foreign matter and smell vary by lot and by supplier. A lot that fails should be rejected at the gate with a reason, before it mixes with good stock.
Raw materials and finished packs both carry manufacture and best-before dates. Stock close to its date needs to be visible and sold first.
Making more than distributors have ordered fills the godown with stock that is ageing. Production should follow confirmed orders, net of stock already packed.
Beyond the inward check, many plants test the blend and the packed product. The results and the release decision need to be recorded, not kept in a register book.
Buying in quintals and kilograms and selling in grams and packs, with the right GST unit code on each unit and HSN codes on every product.
Fininvo modules
The manufacturing, quality and inventory modules of Fininvo ERP, with sales and GST alongside.
| Need | Fininvo module | How it covers it |
|---|---|---|
| Recipes | Bill of materials | Ingredient lines with quantity, unit and scrap % for process loss; operations such as cleaning, roasting, grinding and packing at work centers with setup and run minutes; a live cost per unit. |
| Inward lots | GRN with QC | Each GRN line takes a batch number and expiry date. Mark the GRN as QC required and pass or fail each line with a rejection reason before accepting it. |
| Plant quality | Quality | Inspection plans, inspection lots where results are recorded and a usage decision is taken, a defect log and quality audits. |
| Planning | MRP | Confirmed distributor orders become work order suggestions for packed products and purchase suggestions for anything bought in. |
| Production | Work orders and shop floor | Work orders with material lines from the recipe, and a shop floor board to start jobs and record good output and rejects with a reason code. |
| Dates and batches | Inventory: batches and lots | Products tracked by batch and expiry; a batch register with manufacture and best-before dates that counts batches expiring within 30 days and already expired. |
| Units | Units of measure | Each unit carries the GST unit code (UQC) used in the GSTR-1 HSN summary. |
| Selling and returns | Sales, invoicing and GSTR-1 | Sales orders with a credit check, delivery and GST invoice, e-way bill details prepared as a draft, and the GSTR-1 file per GSTIN. |
Worked example
A spice unit packs garam masala in 100 g pouches for distributors. A distributor orders 5,000 pouches. This is the run in Fininvo ERP, including the steps done by hand today.
The pouch BOM lists coriander, cumin, black pepper and a cinnamon and clove mix by weight, plus one laminated pouch. Each spice line carries a 2% scrap allowance for grinding and sieving loss. Operations cover cleaning, roasting, grinding, blending and packing at their work centers.
Coriander is bought after harvest. Each GRN line records the supplier's lot as the batch number with its expiry date, and the GRN is marked QC required. One lot of cumin fails for foreign matter; the line is failed with that reason and entered as rejected, so it never reaches stock.
The distributor's order for 5,000 pouches is confirmed. MRP finds no packed stock and suggests a work order for 5,000; approving it creates the planned work order with material lines from the recipe.
The work order is released and started from the shop floor board. The packing supervisor records 4,960 good pouches and 40 rejected for seal failure, with the reason code. An inspection lot for the blend is recorded and released with a usage decision.
The work order screens do not move stock by themselves today. Stores record the spices issued, including the grinding loss, and the 4,960 pouches received, as an approved stock adjustment.
The packed batch is added to the batch register with its manufacture date and best-before date, so it appears in the 30-day expiry banner well before it runs out of shelf life.
Create Delivery from the sales order and ship it, then Create Invoice with the HSN code and GST rate of the product. The e-way bill details are prepared as a draft and the number is generated on the portal. At month end the GSTR-1 file is downloaded and uploaded on the GST portal.
The example in numbers
Work order lines are the recipe quantity x 5,000. The last column adds the 2% process loss.
| Material | Unit | Per pouch (BOM) | Work order line | With 2% loss, to issue |
|---|---|---|---|---|
| Coriander seed | kg | 0.040 | 200 | 204 |
| Cumin seed | kg | 0.025 | 125 | 127.5 |
| Black pepper | kg | 0.015 | 75 | 76.5 |
| Cinnamon and clove mix | kg | 0.020 | 100 | 102 |
| Laminated pouch | piece | 1 | 5,000 | 5,000 |
The four spice lines add up to 0.1 kg per pouch, the declared 100 g. The work order shows 500 kg of spice; the plant actually issues 510 kg because 2% is lost in grinding and sieving. Work order lines do not add the BOM scrap percentage today, so the stores team issues against the last column and records the difference.
The packing result, 4,960 good out of 5,000, is a 0.8% packing reject on top of the process loss. Both numbers end up on records you can review at the next recipe costing, rather than in a supervisor's notebook.
Cost and yield
In a spice or flour unit, a few percent of loss on every batch is the difference between the margin on the quotation and the margin in the books. Putting the scrap percentage on each ingredient line of the BOM means the cost per unit in the BOM includes it, which is the number your prices should start from.
Raw material is valued at its purchase order price when the GRN is accepted, and the moving average cost per warehouse is recalculated on every receipt. Seasonal buying at a lower price therefore flows into stock value as you receive it. The Costing area adds cost standards, activity rates per work center, a cost view on each work order and variance reports for the review.
For the ledger side, see the accounting features; for purchase tax, match supplier bills with GSTR-2B reconciliation before claiming input tax credit.
Outlets and teams
If you sell from your own outlet or a factory shop, that counter runs on Fininvo POS with the same products. Bakeries and sweet shops have their own setup with advance orders, a production sheet, recipes and waste: see bakery and sweet shop billing and factory outlet billing.
Food plants run shifts, often with contract and seasonal labour. Fininvo HRMS covers shift rosters and attendance, and Fininvo Payroll covers PF and ESI, as separate products on the same login.
If you manufacture more than food, the manufacturing industry page covers the accounting side of BOMs and work orders in more depth.
Straight answers
The gaps that matter most for a licensed food business.
There is no FSSAI licence register, no FSSAI annual return and no label compliance check in Fininvo ERP.
Raw material lots and finished batches are both recorded, but Fininvo does not link which inward lots went into which finished batch. A recall trace is done from your production records.
Recording output updates the work order, not stock. Issue ingredients and receive packs with an approved stock adjustment.
The BOM scrap % is used in costing the recipe, but work order material lines are the plain recipe quantity. Issue the loss allowance on top.
A work order produces one finished product. By-products such as husk or oil cake are recorded separately.
Fininvo does not read weighing scales, filling machines or metal detectors on the line. Quantities are entered by people.
Yes. A recipe is a bill of materials: ingredient lines with quantity, unit and a scrap percentage for process loss, operations at work centers, and a live cost per unit. Work orders take their material lines from it.
Yes. Products can track batch and expiry, goods receipt lines take a batch number and expiry date, and the batch register holds manufacture and expiry dates and flags batches expiring within 30 days.
Yes. Mark the goods receipt as QC required, fail the line with a rejection reason and enter the quantity as rejected. Only accepted quantities go into stock when the GRN is accepted.
Not today. Fininvo has no FSSAI licence register, annual return or label compliance check. It keeps the batch, date and quality records that a food safety system relies on.
Not automatically. Inward lots and finished batches are both recorded with dates, but the link between them is not built, so a recall trace is worked out from production records.
Yes. Fininvo POS has a bakery and sweet shop setup with advance orders, a production sheet, recipes and waste, and a factory outlet setup, on the same products as the ERP.
Free trial
Try every ERP module free for 14 days. Paid plans start after the trial.