A stock item per size and colour
Retailers order a medium in indigo, not a kurta. Stock, barcodes and sales have to be counted at that level, or the shelf and the ledger never agree.
ERP for textiles and apparel
A garment business buys fabric by the metre, sends it out for dyeing, printing or stitching, gets back pieces in a grid of sizes and colours, and sells them by the dozen to retailers on credit. Fininvo ERP keeps each size and colour as its own stock item, holds the fabric recipe with cutting loss, tracks what sits with each job worker, and runs the wholesale order through to the GST invoice.
What the industry needs
The difficulty in apparel is multiplication: one style becomes twelve stock items once sizes and colours are counted, and much of the work happens outside your own walls.
Retailers order a medium in indigo, not a kurta. Stock, barcodes and sales have to be counted at that level, or the shelf and the ledger never agree.
Fabric is bought by the metre or kilogram and consumed per piece, with a loss at cutting that depends on the marker. The recipe has to carry both the consumption and the loss.
Fabric and cut pieces spend weeks at dyers, printers, embroiderers and stitching units. You need to know what each one holds, what came back and how much was rejected.
Shade, width and weight vary between lots from the same mill. A lot that fails has to be rejected before it is cut.
Wholesale buyers expect credit and seasonal terms. Limits should be checked before goods are packed for a buyer who has not paid for the last season.
Fabric and garments sit under different HSN codes and rates, and units such as metres need the right GST unit code in the HSN summary of the return.
Fininvo modules
Catalog, manufacturing, purchasing, sales and GST in one Fininvo ERP workspace.
| Need | Fininvo module | How it covers it |
|---|---|---|
| Sizes and colours | Product attributes | Attributes such as colour and size, grouped in attribute groups, describe each product and power filters. Each size and colour is its own product with its own SKU. |
| Fabric recipe | Bill of materials | Fabric in metres, trims in pieces, each with a scrap % for cutting loss; operations for cutting, stitching, finishing and packing; a live cost per piece. |
| Units | Units of measure | Metres, kilograms and pieces, each with the GST unit code used in the GSTR-1 HSN summary. |
| Fabric buying | Purchase orders and GRN | GRN from the purchase order with a batch number on each line, for example the dye lot, and accepted and rejected quantities. |
| Fabric checks | Quality | Mark the GRN as QC required and pass or fail each line with a rejection reason before acceptance. |
| Job work | Subcontracting | On the Enterprise plan: subcontract orders to a job worker, components sent, a register of the stock each job worker holds, quantities received and rejected, and vendor performance. |
| Planning | MRP and work orders | Confirmed orders become work order suggestions per size and colour; work orders take their material lines from that item’s BOM. |
| Wholesale selling | Sales orders and invoicing | Confirming an order checks the buyer credit limit and reserves stock; delivery and GST invoice follow from the order. |
| Store counter | Fashion POS | A size and colour grid at the counter, tags from goods receipts, exchanges and alterations for your own clothing stores. |

Worked example
A garment maker receives a retailer order for 600 kurtas in two colours and three sizes. Cutting happens in-house; stitching is done by an outside unit.
Colour and size are attributes. The style becomes six products, one for each size and colour, each with its own SKU, barcode and HSN code. Fabric is a product measured in metres.
Each kurta BOM lists its fabric consumption (2.3 m for small, 2.5 m for medium, 2.7 m for large), buttons, a label and thread, with a 6% scrap allowance on fabric for cutting loss. Operations cover cutting, stitching, finishing and packing.
The order is entered with six lines and confirmed after the credit check. MRP suggests six work orders, one per size and colour; approving them creates the planned work orders with material lines from each BOM.
Fabric is ordered from the mill. On arrival, each GRN line records the dye lot as its batch number and the GRN is marked QC required. One lot of maroon is off-shade: that line is failed with the reason and entered as rejected, and the mill sends a replacement.
A subcontract order is raised to the stitching unit and the cut components are recorded as sent. The job worker stock register now shows what that unit holds. When the kurtas come back, 590 are received and 10 rejected for uneven seams.
Work orders and subcontract orders do not move stock in your warehouses today. Stores record the fabric used and the finished kurtas received by size and colour as an approved stock adjustment.
Create Delivery from the order and ship the 590 pieces, then Create Invoice. The e-way bill details are prepared as a draft and generated on the portal. The GSTR-1 file for the month is downloaded and uploaded on the GST portal.
The example in numbers
Work order lines are BOM consumption x pieces. The last column adds the 6% cutting loss.
| Item | Pieces | Fabric per piece (m) | Work order line (m) | With 6% cutting loss (m) |
|---|---|---|---|---|
| Kurta, indigo, S | 80 | 2.3 | 184 | 195.0 |
| Kurta, indigo, M | 120 | 2.5 | 300 | 318.0 |
| Kurta, indigo, L | 100 | 2.7 | 270 | 286.2 |
| Kurta, maroon, S | 80 | 2.3 | 184 | 195.0 |
| Kurta, maroon, M | 120 | 2.5 | 300 | 318.0 |
| Kurta, maroon, L | 100 | 2.7 | 270 | 286.2 |
Each colour needs 754 m on the work order lines and about 799 m once cutting loss is added. Work order lines do not add the BOM scrap percentage today, so the fabric order to the mill is placed against the last column.
On the return from the stitching unit, 10 of 600 rejected is a 1.7% rejection, recorded against the subcontract order. Vendor performance in the subcontracting area reads those receipts, which is useful when deciding which unit gets the next season's work.
Job work
In most textile clusters a large share of the work happens at someone else's premises: a dyeing house, a printer, an embroidery unit, a stitching contractor. The usual problem is not the price of the work but losing count of what is out there.
Fininvo's subcontracting area, on the Enterprise plan, gives each job worker an order with the components to send, a register of the stock that job worker holds, and receipts with received and rejected quantities. When a subcontract order is linked to a work order, its cost is added to that work order's cost view.
What it does not do yet is the GST side of job work. Goods sent to a job worker usually travel on a delivery challan, and principals file ITC-04. Fininvo does not prepare either today, so keep those in your current process. The e-way bill page explains how e-way bill details are prepared in Fininvo.
Stores and exports
If you also run clothing or footwear stores, the counter runs on Fininvo POS with a size and colour grid for picking the right item, tags printed from goods receipts, exchanges and alterations. The fashion and footwear billing page has the details, and the factory outlet page covers selling seconds and surplus from your own shop.
Exporters should note that multi-currency sales and purchase documents are built but not on production yet. Invoices are raised in the company currency for now.
Cutting and finishing floors run on shifts and piece-rate or monthly wages. Fininvo HRMS has shift management and Fininvo Payroll has PF and ESI compliance, as separate products on the same login. For the accounting side of production, see the manufacturing industry page.
Straight answers
Read these before you plan a migration.
Each size and colour is created as its own product. The ERP does not generate a size and colour matrix for a style; the POS counter has a size and colour grid for selling.
Subcontract orders track goods at job workers, but Fininvo does not print job work delivery challans or prepare the ITC-04 return.
Sending components, receiving from a job worker and completing a work order do not change stock in your warehouses. Use an approved stock adjustment.
The BOM records the scrap %, but work order material lines are the plain consumption. Order and issue the loss allowance on top.
Fabric is tracked by quantity and batch, for example by dye lot. There is no roll-by-roll metre balance or shade matching between rolls.
Multi-currency documents are not on production yet, and Fininvo does not file GST returns directly; it prepares files for upload.
Yes, as product attributes. Colour and size are set up as attributes and each size and colour is its own product with its own SKU, so stock and sales are counted at that level. The ERP does not generate the size and colour matrix automatically.
Yes. The bill of materials for each item lists fabric in metres with a scrap percentage for cutting loss, along with trims and operations. Work order lines use the plain consumption, so add the loss allowance when you buy and issue fabric.
On the Enterprise plan, yes. Subcontract orders record the components sent to each job worker, keep a register of the stock each one holds, and record quantities received and rejected. Stock in your own warehouses is adjusted separately.
Not today. Fininvo does not print job work delivery challans or prepare ITC-04. Keep those in your current process.
Yes. Fininvo POS has a fashion and footwear setup with a size and colour grid at the counter, tags from goods receipts, exchanges and alterations, on the same products as the ERP.
Not yet on production. Multi-currency documents are built but not released, so invoices are raised in the company currency for now.